Serou High School Construction

Djougou, Benin


Design -build project for construction of a new four classroom school building, a new 8-stall Ventilated Improved Pit (VIP) latrine building (4 stalls for females/ 4 stalls for males), a new rainwater collection system with four taps for hand washing, and a new solar power electrical system to power the new school building, in Djougou, Benin.

The new school and latrine facilities shall be permanent structures utilizing reinforced concrete and CMU block construction methods.
The rainwater collection system shall collect roof runoff from the new school building and supply water to four taps for hand washing.

Scope of work

CDC scope of work was performing and providing electronic design submittals ,Design Analysis for all civil construction works and list the basis of design for all project aspects and features and providing detail plans for any site features constructed or modified, for example walls, manholes, pavements, ramps, and so on, and also for any features special to the nature of the proposed use of the finished site.

  • Project Area Education
  • LocationDjougou, Benin
  • SectorsConstruction Documents
    Design Development
    Technical Design
Architecture is basically a container of something, i hope they will enjoy not so much the teacup, but the tea.
Yoshio Taniguchi