Kabul Military Training Center (KMTC) Phase - II

Kabul, Afghanistan


The intent of this project is to construct and refurbish additional buildings at the Afghan Kabul Military Training Center (KMTC) as a part of Phase II.

Scope of work

CDC’s Scope of work is the design of:

- 2,800 m2 Garrison Buildings (single story)
- 300 m2 Simulation Building (single story)
- 1,000 m2 Theater Building (single story)
- 2,200 m2 Library Building (two-story)
- 500 m2 Post Exchange/Bazaar Building
- 1,760 m2 Classroom Building (two-story)
- 4 Barracks Buildings (4-stories each)
- 2 Administration Buildings

  • Project Area Defense
  • Cost USD 20,000,000.00
  • SectorsConceptual Design
    Working Drawings
We require from buildings two kinds of goodness: first, the doing their practical duty well, then that they be graceful and pleasing in doing it.
John Ruskin