Hadayek El Nasr WTP

Cairo, Egypt


Water Treatment Plant (total area of about 40000 m²) consists of 12 construction items including a Pump House, Generator Building, Chemical Building, Underground Water Tanks (800m³ & 1000m³), Administration Building, Warehouses, Workshops, Guard House, and other small constructions.

Scope of work

Construction Development Center team role was to complete the design in all trades, and production of shop drawings for the entire WTP including all the buildings.

  • Project Area Industrial
  • Cost 10,000,000.00
  • SectorsArchitectural
    Electromechanical
    Structural
Design is a constant challenge to balance comfort with luxe, the practical with the desirable.
Donna Karan