Diffa, Niger
The work includes a steel frame building with separate maintenance, secure storage and office spaces With a total covered area of 276 m2. The superstructure will be a metal frame structure resting on reinforced concrete slab supported on reinforced concrete foundations. The work also includes vehicle loading ramps, two concrete pads for generator & fuel tank and a maintenance pit. The piping and electrical designs are also required for the facility.
Scope of work
CDC shall provide detail plans for any site features constructed or modified, for example, walls, manholes, pavements, ramps, and so on, and for any features special to the nature of the proposed use of the finished site.
Whether we're working on a design of an administration building, a chain of restaurants or a healthcare facility, we approach all of our designs with the same excitement. We all enjoy our work and we take great pride in creating not only uniquely different designs but spaces that are functional and profitable.