Vehicle Maintenance Facility

Diffa, Niger


The work includes a steel frame building with separate maintenance, secure storage and office spaces With a total covered area of 276 m2. The superstructure will be a metal frame structure resting on reinforced concrete slab supported on reinforced concrete foundations.
The work also includes vehicle loading ramps, two concrete pads for generator & fuel tank and a maintenance pit.
The piping and electrical designs are also required for the facility.

Scope of work

CDC shall provide detail plans for any site features constructed or modified, for example, walls, manholes, pavements, ramps, and so on, and for any features special to the nature of the proposed use of the finished site.

  • Project Area Automotive
  • LocationDiffa, Niger
  • SectorsConceptual Design
    Structural
    Technical Design
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.