Zagnanado, Benin
Design-build project for construction of a new three classroom school building with office and storeroom, a new 8-stall Ventilated Improved Pit (VIP) latrine building (4 stalls for females/ 4 stalls for males), a new rainwater collection system with four taps for hand washing, and a new solar power electrical system connected to the new school building, in Zagnanado, Benin. The new school and latrine facilities shall be permanent structures utilizing reinforced concrete and CMU block construction methods.The rainwater collection system shall collect roof runoff from the new school building and supply water to four taps for hand washing.
Scope of work
CDC scope of work was performing and providing electronic design submittals ,Design Analysis for all civil construction works and list the basis of design for all project aspects and features and providing detail plans for any site features constructed or modified, for example walls, manholes, pavements, ramps, and so on, and also for any features special to the nature of the proposed use of the finished site.
Architecture is basically the design of interiors, the art of organizing interior space.