Uzbekistan
The project consisting of a concrete apron for Aircrafts parking, waste collection system, expansion of an existing waste water treatment facility & a pre-engineered Metal Building for security & immigration.
Scope of work
The scope of the project entailed the structural design and production of shop drawings for the required construction, in addition to the complete production of construction documents.
We require from buildings two kinds of goodness: first, the doing their practical duty well, then that they be graceful and pleasing in doing it.